The objective of warehouse layout is to minimize costs associated with warehouse space.

A) True
B) False

Correct Answer

verifed

verified

Standard time is always greater than normal time, due to the inclusion of allowances for personal time, delay, and fatigue.

A) True
B) False

Correct Answer

verifed

verified

A work cell is required to make 80 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell currently works an eight-hour shift, of which seven hours are available for productive work. These assemblies require five operations, with times of 1.0, 1.8, 2.4, 2.5, and 1.4 minutes each. What is takt time for this cell?

Correct Answer

verifed

verified

Takt time = 420 minu...

View Answer

Ambient conditions; spatial layout and functionality; and signs, symbols, and artifacts are all:


A) indicators of imbalance on an assembly line.
B) indicators that cross-docking has been successful.
C) elements of customization in a warehouse layout.
D) elements of servicescapes.
E) elements of successful office layouts.

F) A) and D)
G) B) and E)

Correct Answer

verifed

verified

Which of the following is one of the main advantages of a product-oriented layout?


A) high customer exposure rates
B) employability of highly skilled labor
C) high flexibility
D) low capital cost
E) low variable cost per unit

F) All of the above
G) A) and B)

Correct Answer

verifed

verified

Why do work cells increase the utilization of equipment and machinery?

Correct Answer

verifed

verified

Work cells increase the utiliz...

View Answer

________ is the maximum time that the product is allowed at each workstation.

Correct Answer

verifed

verified

________ often calls for fewer but longer days, such as four 10-hour days.

Correct Answer

verifed

verified

Flexible w...

View Answer

Labor standards were pioneered by Frank and Lillian Gilbreth and:


A) Frederick Taylor.
B) Eli Whitney.
C) Henry Ford.
D) Alan Smith.
E) GE.

F) A) and C)
G) B) and C)

Correct Answer

verifed

verified

An assembly line consists of 21 tasks grouped into 5 workstations. The sum of the 21 task times is 90 minutes. The largest assigned cycle time is 20 minutes. What is the efficiency of this line?


A) 4.2 percent
B) 17 percent
C) 85 percent
D) 100 percent
E) 90 percent

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

Work sampling estimates the percent of time that a worker spends on various tasks.

A) True
B) False

Correct Answer

verifed

verified

Hemo-tech, Inc., a biomedical technology and research laboratory, produces a standard blood filtering device on an assembly-line basis. Six basic tasks are performed along the assembly line. The time to perform each task and the tasks that must immediately precede each task are in the table below. Twenty pumps per 450-minute day must be produced by the assembly line. Hemo-tech, Inc., a biomedical technology and research laboratory, produces a standard blood filtering device on an assembly-line basis. Six basic tasks are performed along the assembly line. The time to perform each task and the tasks that must immediately precede each task are in the table below. Twenty pumps per 450-minute day must be produced by the assembly line.    (a) Draw the network diagram of the precedence relationships. (b) Identify the absolute minimum and maximum cycle times. (c) What is the cycle time required to meet demand? (d) What is the minimum number of workstations required to meet the schedule? (e) Balance this line using the most following tasks heuristic. (f) What is the efficiency of the line obtained in part (e)? (g) Can the efficiency of this solution be improved? Explain. (a) Draw the network diagram of the precedence relationships. (b) Identify the absolute minimum and maximum cycle times. (c) What is the cycle time required to meet demand? (d) What is the minimum number of workstations required to meet the schedule? (e) Balance this line using the most following tasks heuristic. (f) What is the efficiency of the line obtained in part (e)? (g) Can the efficiency of this solution be improved? Explain.

Correct Answer

verifed

verified

(a) The appropriate diagram appears belo...

View Answer

A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. Managers wish to produce 600 units per day, working two 8-hour shifts. A facility is trying to set up an assembly line, and has identified the various tasks, and their relationship to each other, as shown in the following table. Managers wish to produce 600 units per day, working two 8-hour shifts.    (a) Draw a network diagram of precedence relationships. (b) Compute the required cycle time per unit in seconds. (c) Compute the minimum number of workstations required to produce 600 units per day. (d) Balance this line using the longest processing time heuristic. (e) What is the efficiency of the line obtained in part (d)? (a) Draw a network diagram of precedence relationships. (b) Compute the required cycle time per unit in seconds. (c) Compute the minimum number of workstations required to produce 600 units per day. (d) Balance this line using the longest processing time heuristic. (e) What is the efficiency of the line obtained in part (d)?

Correct Answer

verifed

verified

(a) The precedence diagram appears below...

View Answer

What design guidelines help retail layouts to maximize customer exposure to products?

Correct Answer

verifed

verified

1. Locate the high-draw items around the...

View Answer

Sample observations of a claims processor made over a 160-hour work month reveal that the worker produced a total of 384 completed claims forms. The performance rating was 90%. The worker was idle 20% of the time (so that idle time should be subtracted from the total time when computing the average observed time) . The allowance factor is 10%. What is the standard time per unit?


A) 0.42 minutes
B) 16.0 minutes
C) 17.4 minutes
D) 20.0 minutes
E) 21.7 minutes

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

Which of the following is NOT an advantage of work cells?


A) reduced direct labor cost
B) decreased equipment and machinery utilization
C) heightened sense of employee participation
D) reduced raw material and finished goods inventory
E) reduced investment in machinery and equipment

F) B) and D)
G) C) and D)

Correct Answer

verifed

verified

Kanbans and flow diagrams are both techniques of the visual workplace because they are visual signals that replace printouts and paperwork.

A) True
B) False

Correct Answer

verifed

verified

The concept of customizing in a warehouse layout:


A) is possible, but it causes serious loss of oversight of the quality function.
B) cannot be considered seriously in today's high efficiency factories.
C) is theoretically sound, but several years away in practice.
D) incorporates value-added activities in warehouses.
E) locates stock wherever there is an open location.

F) A) and C)
G) C) and D)

Correct Answer

verifed

verified

Suppose that the allowance factor for a job is 0.05, and the normal time is 5 hours. What is the standard time?


A) 5.6 hours
B) 5.2 hours
C) 4.9 hours
D) 5.3 hours
E) 4.8 hours

F) A) and C)
G) All of the above

Correct Answer

verifed

verified

A bank manager wants to determine the percent of time the bank's tellers are working and idle. He decides to use work sampling, and his initial estimate is that the tellers are idle 22% of the time. Approximately how many observations should be taken to be 95% confident that the results will not be more than 5% away from the true result?


A) 6
B) 16
C) 203
D) 264
E) 246

F) A) and E)
G) B) and E)

Correct Answer

verifed

verified